The approximately 20-year statement requires documentary confirmation.
Preparing building intelligence…
Preparing building intelligence…

The original DLV website documents a long-running GCOP application at Televisa Chapultepec supporting continuous broadcasting operations in Mexico City.
The approximately 20-year statement requires documentary confirmation.
Customer-supplied operating context; service records and system boundaries require confirmation.
The calculation basis and comparison equipment population require engineering documentation.
These labels describe the evidence currently available in the project. They do not elevate reported or projected information to verified performance.
Broadcasting operations can require persistent cooling for technical and occupied spaces while maintaining reliable chilled-water service.
Central chilled-water application. Additional capacity, controls, schedule, climate, baseline, and condition details remain subject to source documentation.
Available materials associate GCOP with the chilled-water application. Final installed scope, control sequence, operating period, and system architecture require a publication-ready technical record.
The available materials report performance context, but additional measurement-and-verification documentation is required before publication as a verified result.
Share your equipment, operating profile, controls, and available energy data. Final eligibility and performance methodology require project-specific review.