How does the DLV Energy process begin?+
It begins with a focused discovery conversation about facilities, HVAC assets, operating priorities, available data, and decision criteria.
What information is needed for an initial assessment?+
An equipment list, facility schedules, utility information, controls context, operating concerns, and available photos or nameplate data are useful starting points.
Does every facility qualify?+
No. Equipment, controls, operating conditions, data availability, client requirements, and project economics all require review.
Does every RTU qualify for RTU-SC?+
No. Packaged-unit configuration, fan motor, electrical requirements, compressor staging, ventilation needs, controls, condition, and access must be reviewed.
Does every chiller qualify for GCOP?+
No. Controller compatibility, BACnet points, writable setpoints, plant sequence, safeguards, load profile, and available measurements must support the application.
Is a site visit always required?+
Not necessarily for initial screening. Engineering may request a site survey when records, photographs, controls information, or operating data are insufficient.
Can DLV Energy begin with utility bills and equipment lists?+
Yes. They can support initial screening, although more information is normally needed before final qualification, scope, and pricing.
What happens during engineering qualification?+
The team reviews compatibility, controls, integration pathways, required components, operating limits, risks, and remaining data gaps.
How are preliminary savings calculated?+
Preliminary analysis uses available equipment, runtime, utility, rate, load, and operating information together with documented assumptions.
Are savings estimates guaranteed?+
No. Preliminary estimates are not guarantees, proposals, engineering studies, or utility-grade measurement-and-verification reports.
What is a pilot project?+
A pilot is a controlled implementation on selected equipment or at a selected facility with an agreed baseline, evaluation approach, scope, and success criteria.
Is a pilot required?+
No. A direct rollout may be appropriate when compatibility, data, controls, internal validation, and project economics are sufficiently understood.
How is pilot equipment selected?+
Selection considers compatibility, runtime, data quality, operating representativeness, metering, site access, stakeholder needs, and expansion value.
What is Evaluation Mode?+
For qualifying RTU-SC and GCOP projects, it may alternate optimized operation with approved baseline-style operation to support comparison under similar periods.
How long does an evaluation take?+
The appropriate period depends on weather, load, occupancy, schedules, equipment staging, data quality, and the agreed methodology.
How are optimized and baseline periods compared?+
The agreed approach may review meters, capacity, trends, utility data, weather, runtime, schedules, and operating differences.
Is direct power metering available?+
Optional power metering may be included when supported by the approved scope, equipment, electrical design, and evaluation plan.
What is included in installation?+
The final scope may include controllers, drives, sensors, meters, gateways, wiring, programming, dashboards, and approved network connections.
How long does installation take?+
Duration depends on equipment count, electrical work, controls complexity, access, network approval, operating restrictions, and commissioning requirements.
Will installation interrupt facility operations?+
Planning considers occupied hours, shutdown windows, safety, weather, access, IT change control, and operational constraints to manage disruption.
Who performs the installation?+
Roles may be shared among DLV Energy, approved HVAC or controls partners, electrical contractors, and the client team as defined in the scope.
What happens during commissioning?+
Inputs, sensors, communications, limits, commands, fallback behavior, schedules, dashboards, alarms, and evaluation configuration are validated.
How does DLV Energy protect comfort requirements?+
Facility-specific comfort requirements, ventilation needs, approved limits, safeguards, coordination, and operational review inform the controls strategy.
How are critical environments handled?+
Clinical, process, and other critical requirements must be identified during assessment and incorporated into engineering, limits, approvals, and commissioning.
Can the system integrate with an existing BMS?+
Integration may be available where supported points, protocols, controls architecture, permissions, and engineering review allow it.
What IT involvement is required?+
IT may review network architecture, cybersecurity, addressing, firewall rules, BACnet access, user permissions, remote connectivity, and data services.
Is cloud connectivity required?+
The approved architecture depends on the project. Local and connected components, visibility, and reporting requirements are defined during review.
How are results reported?+
Reporting may include operational status, trends, commissioning records, estimated or measured energy behavior, financial context, and portfolio priorities.
What is the difference between estimated and verified savings?+
Estimates use available assumptions and calculations. Measured data comes from validated sources. Verified results follow an agreed post-installation methodology.
What happens after a successful pilot?+
The client and DLV Energy can review agreed criteria, rank additional assets, plan deployment, expand reporting, and build a phased portfolio strategy.
Can the solution expand to multiple facilities?+
Yes, when additional assets qualify and the client approves a practical data, installation, controls, reporting, and capital plan.
Can RTU-SC and GCOP be implemented together?+
They may be combined when a facility has qualifying rooftop and chilled-water assets and the project architecture supports both workflows.
What happens if equipment does not qualify?+
The recommendation may be to repair, replace, add data or metering, update controls, select another asset, or reassess after operational changes.
Does DLV Energy offer financing?+
Financing or performance-based options may be discussed when an approved program or project partner is available. Availability, eligibility, pricing, and terms must be confirmed separately.
How can we begin?+
Start a facility assessment or schedule an executive briefing with the available equipment, facility, operating, and energy context.