Capacity difference is not automatically equivalent to energy savings; methodology requires review.
Preparing building intelligence…
Preparing building intelligence…
Customer-supplied project information reports a capacity-based GCOP comparison at Calhoun Community College.
Capacity difference is not automatically equivalent to energy savings; methodology requires review.
These labels describe the evidence currently available in the project. They do not elevate reported or projected information to verified performance.
The campus needed a transparent way to compare chiller behavior during optimized and non-optimized operation.
Central chilled-water system. Additional capacity, controls, schedule, climate, baseline, and condition details remain subject to source documentation.
GCOP was operated in an evaluation-oriented comparison intended to assess chiller-capacity behavior.
The supplied statement compares average chiller capacity when GCOP was active versus inactive. Dates, load normalization, weather, setpoints, and power-meter data require confirmation.
Share your equipment, operating profile, controls, and available energy data. Final eligibility and performance methodology require project-specific review.